6-week pilot mapping every handoff from application through referencing to lease creation; colleague only escalated missing items and drafted applicant updates.
Operating layerOnboardingAI teammates
Five category pages for sector-specific case studiesView categories →
Case study·Build-to-rent
Application-to-lease handoff
From a leaky eleven-day application cycle — to a tracked, owned handoff under nine days
22%
Application cycle reductionFrom 11 working days to under 9
“The handoff finally had an owner every day.”
UK BTR / multifamily operator·1,400 units across 3 pilot assets·6-week pilot·United Kingdom
01Pilot envelope
Pilot length6 weeks
First signal7 days
First ROI35 days
Team alongside4 seats · 2 colleagues
02What it owns
Reports toHead of Resident Onboarding, dotted line to site managers on move-in readiness.
Owns
- Application queue — every reserved unit triggers a Homeppl invite within the same business day
- Referencing chase — one consolidated applicant update per file, drafted for review and never sent twice
- Lease pre-check — every OneSite + DocuSign pack reconciled against the approved Homeppl file before it leaves the team
- Move-in heads-up — site managers receive a confirmed move-in card 48 hours ahead with deposit and key status
- Daily handoff brief — outstanding files, blocked applicants and SLA breaches surfaced for the Head of Resident Onboarding by 9am
Does not do
- Decline decisions — flags the file, the Head of Resident Onboarding decides
- Direct applicant email — drafts only, leasing associate sends
- Lease signature — DocuSign pack is approved by the Head of Resident Onboarding
Done looks like
No reserved unit goes a working day without a tracked next step. Lease packs go out right the first time and site managers know about every move-in two days ahead.
03The team
AI teammates2
SofiaWatches every reservation, opens referencing on time, drafts applicant updates and surfaces files missing documents or signatures.


MarcusCross-checks approved files against OneSite and the DocuSign pack, flags lease drafts with stale rent or missing addenda before they go out.



Human team4
- Head of Resident OnboardingLeasing leadership
- 7 Leasing associatesLeasing
- 3 Referencing & onboarding adminsOnboarding
- 2 Site managersOperations
04Connected stack
05What it returned
22%Application cycle reductionFrom 11 working days to under 9
43Blocked applications clearedFiles past referencing SLA at pilot start
61%Avoidable applicant chasers downDuplicate and unnecessary follow-ups eliminated
- Day 0Co-ordinator sessionStakeholders, stage definitions and the current backlog of stalled files agreed in one call.
- Day 7First signalHubSpot, Homeppl and OneSite joined; Sofia produces the first read-only handoff brief listing 27 stalled reservations.
- Day 14Read-only goes liveDaily brief lands in the leasing Outlook channel; the team corrects four field mappings between Homeppl statuses and OneSite stages.
- Day 21Approval-gated chasersSofia begins drafting applicant updates; leasing associates send after a one-line review.
- Day 28Lease pre-check liveMarcus starts cross-checking DocuSign packs; first three drafts caught with stale rent before sending.
- Day 35ROI reviewSponsor signs off on cycle time, cleared backlog and chaser reduction; expansion to a fourth pilot asset approved.
06Related templates
↗Get started
Want this for your team?
Each design-partner pilot starts the same way: one workflow, the minimum useful context, and a first ROI signal measured in days.
