Journal of Engineering Research and Reports · 2025 · Journal article

Application of Lean Six Sigma in Construction Project Management: Reducing Delays and Cost Overruns

Joy Kizito Aryan, Shehab aldeen Mohammed Mohsen Albaadani, Dagmawi Girma Gebre, B. Boateng, A. Olalekan

Date
2025-10-30
Citations
0
Cite
@article{aryan2025application,
  title = {Application of Lean Six Sigma in Construction Project Management: Reducing Delays and Cost Overruns},
  author = {Joy Kizito Aryan and Shehab aldeen Mohammed Mohsen Albaadani and Dagmawi Girma Gebre and B. Boateng and A. Olalekan},
  year = {2025},
  journal = {Journal of Engineering Research and Reports},
  doi = {10.9734/jerr/2025/v27i111698},
  url = {https://doi.org/10.9734/jerr/2025/v27i111698},
}